Initially, the geometric design of the structure was carried out based on the topographic survey of the current state in order to proceed with the development of the stakeout points. The projection system used was Lambert.
After the project was approved, it was supervised and then the base of the structural system for the placement of the solar panels was redesigned.
The calibration of the staking out bases and adaptation to the coordinate system for each area of the districts in France has been the most technically complex part, providing a perfect solution to the demands made.
Subsequently, the points that make up the base of the structure have been physically re-planned. ‘More than 1 million points re-planned’ approximately among the 72 photovoltaic plants.
Monitoring, supervision and execution of the layout by our highly qualified engineers with extensive experience in the work carried out, with the great satisfaction of our clients for a job well done being our greatest guarantee.